Rosenheim

B 15, Westtangente Rosenheim

The Challenge

With the construction of the west-tangent the “Ängergraben” was underpassed with one corrugated steel structure amongst others.

The assembly was realized outside of the trench because the construction period had to be minimized. The lifting happened with two mobile cranes (40tons and high range) afterwards.

  • profile: MB 11
  • corrugation: 200 mm x 55 mm
  • span: 5,29 m
  • height: 3,28 m
  • length: 53,00 m
  • plate thickness: 5,00 mm
  • corrosion protection: hot-dip galvanization plus coating