Gravel works Milchplatz

The Challenge

In the course of the construction of a gravel works located to the Rhine directly several tunnels and silos made of HAMCO MultiPlate were used. Below the silo battery, consisting of twelve single silos, two conveyor belt tunnels connected by a pump sump made of corruga-ted steel parts were placed.

Twenty four factory-made funnels were integrated into these tunnel buildings. The third conveyor belt tunnel with three funnels was placed below a heap.
Five of the twelve silos have a big factory-made gate to have the option to take material from the silos by a wheel loader.

  • Profile Tunnel KR 20 / KR 23 / KR 28
  • Corrugation 200 mm x 55 mm
  • Span 2,99 m / 3,22 m / 3,59 m
  • Rise 2,99 m / 3,22 m / 3,59 m
  • Length 75,00 m / 125,00 m / 65,00 m
  • Plate thickness different plate thicknesses and types of bolting
  • Corrosion protection Hot-dip galvanization
  • Profile Silo 2 x SKR 118 / 10 x SKR 167
  • Corrugation 200 mm x 55 mm
  • Diameter 2 x 8,83 m / 10 x 12,50 m
  • Height 2 x 12,00 m / 10 x 12,00 m
  • Plate thickness different plate thicknesses and types of bolting
  • Corrosion protection Hot-dip galvanization
Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google
Spotify
Consent to display content from Spotify
Sound Cloud
Consent to display content from Sound