In the course of the rehabilitation of the B 10 one frame-construction had to replaced over the “Schmiebach”.
Because of the existing rock in the ground and the generation of a chokepoint in the view of the traffic, one arch-profile out of Hamco corrugated steel elements was used. Here the short assembly period of the corrugated steel structure was only 2 days.
ViaCon constructs connections. Consciously.
We combine more than three decades of experience with today's cutting-edge technology and vital sustainable goals. ViaCon is a pioneer in the field of Bridges & Culverts-, GeoTechnical- and StormWater Solutions.