SBA Meißen-Dresden, S 156 Bypass Berthelsdorf 4.BA
At this project a Hamco underpass was taken to put through a service road below the bypass road S156 close to Berthelsdorf.
A preshaping of the soil was executed because of the dimension of the structure. The factory-made panel at the cut end should be mentioned here as special feature.
ViaCon constructs connections. Consciously.
We combine more than three decades of experience with today's cutting-edge technology and vital sustainable goals. ViaCon is a pioneer in the field of Bridges & Culverts-, GeoTechnical- and StormWater Solutions.